Special Fabric with Black Powder Coated Painting Metal Frame

Product Details
Style: Modern
Material: Fabric
Usage: Hotel, Home
Still deciding? Get samples of US$ 50/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (14)
  • Special Fabric with Black Powder Coated Painting Metal Frame
  • Special Fabric with Black Powder Coated Painting Metal Frame
  • Special Fabric with Black Powder Coated Painting Metal Frame
  • Special Fabric with Black Powder Coated Painting Metal Frame
  • Special Fabric with Black Powder Coated Painting Metal Frame
  • Special Fabric with Black Powder Coated Painting Metal Frame
Find Similar Products

Basic Info.

Model NO.
OKC-510
Armrest
With Armrest
Color
Grey
Folded
Unfolded
Rotary
Fixed
Customized
Customized
Shape
Rectangle
Condition
Used
MOQ
200PCS
Packing
4pccs/CTN
Type
Modern
Place of Origin
Hebei,China
Transport Package
Carton
Specification
velvet fabric
Trademark
OKAY
Origin
China
HS Code
9401719000
Production Capacity
50000pieces/Year

Product Description


Product Introduction

Product Type: hot sales velvet modern design dining chair
Brand OKAY
Inside Materials:
High quality fabric, iron legs+high density foam
Style: Modern Style
Feature: Eco-Friendly, Comfortable,KD leg
Decoration:  Dining room and Living room, Bar Club
Color: Customized
Delivery Time: For sample order, 10-15 days, for container order, 60-90 days
FOB Seaport: TIANJIN XINGANG
OEM/ODM can be accepted, Customized Materials can be possible
 
Special Fabric with Black Powder Coated Painting Metal Frame
Special Fabric with Black Powder Coated Painting Metal Frame
Special Fabric with Black Powder Coated Painting Metal Frame
Equipment Machinery
We specialize in the furniture's development,production With advanced machinery and technologies, Products completed welding parts by 15 robots, Well guarantee the quality of the products and beautiful. Dining chair supply ability is 80000 pieces per month, plus dining table and coffee table, We export about(110-150)X40 HQ container every month.We introduce modern furniture production line, adopting first-class production craft.

 
Special Fabric with Black Powder Coated Painting Metal Frame
Special Fabric with Black Powder Coated Painting Metal Frame
Tianjin Okay International Trading Co., Ltd
Tianjin Okay International Trading Co., Ltd is exporter. We have our own factory and exporting company.We own two chairs factories and one MDF tables factory. Located in Bazhou city which is famous as an international furniture center.Our own factory was established in 2009, our factory covered more than 20 thousand square meters with more than 300 staffs. In these factories, there are 15 automatic welding robots, professional in-house production line.
 
Special Fabric with Black Powder Coated Painting Metal FrameSpecial Fabric with Black Powder Coated Painting Metal Frame
 
FAQ

1. How about your quality?
We have QC department, they control every process, start from purchasing raw material to finish the goods and loading the container.

2. What is your MOQ?
Usually 200 pcs per model for chairs and 50 pcs per model for tables .

3. Will you pack the goods with assembly instruction?
Yes, we put the assembly instruction into the package. If you still don't know how to assemble, you may consult us.

4. If we want a sample, how much do we need to pay?
We usually charge 2 times price, and the transport fee should be paid by buyer, we will reture the extra money when you place order.

5. Do you participate in any exhibition?
Yes, we participate in Canton Fair, China International Furniture Expo in Guangzhou and Shanghai every year. You are very welcomed to visit our booth.

6. What about the leading time for mass production?
It depends on the order quantity and the product. Usually our leading time is 20-30 days after order confirmed.

If you have any interest, please feel free to contact us. Thank you.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier